![]() Your project should always startfrom the corner and build outfrom there. They have a notch on one side for interlocking and a smooth side for a finished cap. The Garden Accent corner units are available in a left and right configuration. Apply construction adhesive between and underneath the caps to secure them in place. ![]() Alternate the long and short faces to match the design of your garden wall. ![]() Top off your garden wall with AB Garden Accent Caps. Keeping the seams staggered will lock the block together and make the retaining wall stronger.Ĭheck the blocks for level, adjust as needed, and add more courses until you reach the height you want for your garden wall. Stack the next course of AB Garden Accent, and offset the seams from the blocks below. Sweep the blocks clean, and check again to make sure the blocks are level Fill the blocks with wall rock for additional stability. (50 mm) below the finished grade.įill in behind the blocks with soil, and carefully compact to lock them in place. As a rule, the base block should be set at least 2 in. Tap the blocks into place with a rubber mallet, leveling each block as you go. Set the base course of block in the trench and make sure the edges all touch on the forward side of the block. It is essential that the base is level at this point, as errors will multiply as each new row is added. (50 mm) of rock in the trench, level and compact with a hand tamper. ![]() On sloped sites,"step up" the base when it gets more than 6 in. Use a large level to check the trench for level as you dig. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |